详细信息
The Optimization of Construction Period and Resources of Project based on Traverse Network Chart
文献类型:会议论文
英文题名:The Optimization of Construction Period and Resources of Project based on Traverse Network Chart
作者:Li, Yueqin[1];Cai, Hong[1]
机构:[1]Beijing Union Univ, Biochem Engn Coll, Dept Construct Management, Beijing, Peoples R China
第一机构:北京联合大学生物化学工程学院
会议论文集:International Conference on Economic, Education and Management
会议日期:MAR 05-05, 2011
会议地点:Macao, PEOPLES R CHINA
语种:英文
外文关键词:Traverse Network Chart; Optimization for construction period and resources; Project 2007; Project management
摘要:The most complex and essential problem in the project network program technique is the optimization of the network program. The proper and systematic optimized solution for the project network program can significantly increase the profit gained from the project. By using the computer software, the Microsoft Project 2007, an optimization method for the construction period and resource based on traverse network chart was put forward in this paper. The ideal of hierarchical optimization for the integrate resource was also discussed. The construction period and resource in an actual project was optimized by use this method and an excellent optimization effect was achieved.
参考文献:
正在载入数据...